1 result(s) for “Bac R14”
The Minister of Mines, Oil and Energy, Mamadou Sangafowa Coulibaly, commissioned the R14 tank with 20,000 m³ of diesel and the first Ivorian loading station for GESTOCI tank trucks, on July 24, 2026. This double infrastructure brings the total capacity of the depot to 100,700 m³.